City Park Restoration, UT
- Structural Updates: Redesigned the layout to create a more open-concept floor plan, improving functionality and flow. Structural updates to a home involve improving or repairing key components that support its stability and safety. Foundation work, such as fixing cracks or reinforcing footings; roof updates like replacing trusses or changing the roof design; and modifying walls by adding beams, enlarging openings, or replacing damaged materials. Leveling floors, rebuilding staircase, reinforcing basement and attic.
- Exterior: Fully upgraded exterior! New siding, paint, fascias, soffits, rain gutters, exterior lighting etc.
- Flooring: All brand new flooring and carpeting.
- Kitchen Renovation: Fully remodeled kitchen.
- Bathroom Renovation: Fully renovated bathroom.
- Lighting & Electrical: Installed new lighting fixtures, all new electrical wiring.
- Plumbing: Replaced all outdated plumbing with new, efficient systems.
- Paint & Finish Carpentry: All new paint and trims
- Windows & Doors: All new windows.
- HVAC System: Upgraded the heating, ventilation, and air conditioning system for better performance and comfort.
- Additions: Added two bedrooms and one bath in the attic.
- Garage: was fully renovated and we added a bathroom and a space for a future kitchen. Can be used as a flex space.
Additional Information: This home was picked up as fire damaged and rendered unusable. We fully renovated the property and gave the home back a new life.